Loading evidence…
Resource governance · Committee
What the committee spent on a live run, and the controls that keep its model budget bounded.
The invoice exceptions went through the Tier-3 committee with the configured models: Proponent gemini-2.5-flash, Opponent gemini-2.5-flash, Judge gemini-2.5-flash. Costs use the provider list prices in the code's rate table.
| Model | Calls | Input tokens | Output tokens | Cost (USD, list price) |
|---|---|---|---|---|
| google-gla:gemini-2.5-flash | 9 | 19,664 | 1,705 | $0.01 |
Input / output tokens per role. CoVe checks every claim against the invoice and contract with plain code, so verification itself spends no tokens.
| Case | Proponent | Opponent | Judge | Seconds | Claims kept / dropped | Cost |
|---|---|---|---|---|---|---|
| Total 28% above the prior period | 1,478 / 233 | 1,488 / 98 | 3,697 / 252 | 124.22 | 8 / 1 | $0.0035 |
| No approved-invoice register (C8 unverified) | 1,455 / 166 | 1,465 / 113 | 3,518 / 290 | 63.13 | 10 / 2 | $0.0034 |
| Variance and no register | 1,495 / 156 | 1,505 / 132 | 3,563 / 265 | 121.88 | 10 / 2 | $0.0034 |
Implementation boundary: the reviewer implementation has token-economics modules — a rotating key pool, a rate limiter and a per-run cost rollup. Architecture · Decision committee. Resource cost is a decision constraint, never a substitute for evidence.
Six controls keep the model budget bounded.
Engineering source: model selection and routing, key pool, cost control, token board and token-story telemetry.
What the models said on 2026-11-23 (Judge: gemini-2.5-flash). The Judge advises; the reviewer decides.
| Role | Statement | Status |
|---|---|---|
| Proponent | The invoice total of 24395.00 EUR is within the spending_limit of 25000.00 EUR, as per contract clause "4. An invoice total may not exceed the spending limit of 25000.00 EUR." The invoice currency of EUR matches the contract_currency of EUR, as per contract clause "2. The contract is priced in EUR." The invoice documents list 'service-report' and 'timesheet', which matches the required_documents as per contract clause "8. Every invoice lists these documents: service-report, timesheet." The invoice total of 24395.00 EUR, while 28.4% above the prior_period_total of 19000.00 EUR, is supported by… | Argues the invoice is payable |
| Opponent | The invoice total of 24395.00 EUR is 28.4% above the prior period's 19000.00 EUR, exceeding the 20% variance threshold specified in contract clause 9. The invoice total of 24395.00 EUR is close to the spending_limit of 25000.00 EUR, which, combined with the significant variance, suggests potential padding. | Argues to hold it for evidence |
| Judge | • The Proponent also successfully argues that the required_documents, 'service-report' and 'timesheet', are present, which, according to clause 9, provides the necessary evidence for the 28.4% increase over the prior_period_total of 19000.00 EUR. • The Opponent's claims, while accurately stating the variance, do not present any counter-evidence to the Proponent's assertion that the required documentation justifies the increase. • Therefore, the presence of the required documents, as stipulated in clause 9, sufficiently addresses the variance flagged by the Opponent. • The Proponent prevails a… | Advisory package · 8 claim(s) kept, 1 dropped by CoVe |
Evidence in context · engineering illustration
Tier 1 and Tier 2 are plain Python checks. An exception that passes every rule can request the separately budgeted Tier-3 committee; the budget guard may admit, wait, defer or use a permitted fallback.
Source figures · Select one
Choose the concept you want to study. Only one technical blueprint is shown at a time.
Engineering figure · tokecon concept
economicsAll tiers have different resource profiles: Tier 1 is deterministic, Tier 2 may use an AI selector, and Tier 3 is a bounded committee.
Selected mechanism · Tier 1
Every case: no LLM tokens for those tests.
Evidence in context · engineering illustration
Proponent, Opponent and Judge are budgeted and metered separately; CoVe verification is plain code and spends no tokens.
Engineering figure · token economics
economicsRole-level consumption flows into capacity windows and judge budget decisions.
Selected mechanism · Proponent / Opponent
Record input and output per role when available.
Evidence in context · engineering illustration
Cost control belongs around the verification chain, not in place of it. Failed provider calls may enter capped recovery, but a budget cannot turn unverified claims into reviewer decisions.
Source figures · Select one
Choose the concept you want to study. Only one technical blueprint is shown at a time.
Engineering figure · tokecon applied
economicsToken governance couples price discipline to risk-controlled escalation.
Selected mechanism · Avoid model work
Route normal cases with no model inference.
Evidence in context · engineering illustration
The supplied example accounts for a 5,045-token request in an 8,000-token/minute window: a capacity calculation for one committee call.
Engineering figure · token cost
economicsOne case's token use against a capacity window.
Historical case: 5,045 tokens ≈ 63% of an 8,000 TPM window.
Selected mechanism · Input tokens
4,760 input tokens in this case.